Skip to content

Archived production HA migration

The former environment-specific, command-by-command migration runbook has been retired. It depended on manually exchanged SSH keys, copied age recipients, Cloudflare load-balancer pools, Origin CA files, hand-written node IDs, and fixed infrastructure identifiers. Keeping those instructions would make a new installation both harder and less safe.

Use the resumable management interface instead:

mp-opt
  • For an existing single server, choose Commission server → Convert this existing standalone server to Node A. A newly verified off-VPS recovery copy is mandatory before the conversion begins.
  • For an existing two-node installation that still uses Cloudflare Load Balancing, choose High availability → Migrate a legacy Cloudflare load balancer to DNS-only routing. The old routing objects remain disabled for a seven-day rollback window and are deleted only through a separate confirmed checkpoint.

Current end-to-end instructions are in Production setup. The writer-lease, replication, routing, and recovery guarantees are described in Two-node high availability.